In short: Most rooms take several days of equipment to dry; dense plaster and wood floors take longer.
What speeds drying up or slows it down
| Factor | Faster | Slower |
|---|---|---|
| How quickly extraction started | Same day | After a day or more |
| Materials | Drywall, tile, vinyl | Plaster, brick, old-growth hardwood, concrete slabs |
| Where the water went | One room, one floor | Ceilings, wall cavities, several units stacked below |
| Air in the space | Warm, with dehumidifiers running | Cold cellars, windows open on humid days |
| Equipment left on | Running around the clock | Switched off at night or unplugged |
How Drying Progress Is Measured
Readings are taken at the same points every visit, so you can see the numbers fall day by day.
Why Fordham buildings take longer
Most of Fordham's housing predates 1930: three-coat plaster on wood or metal lath, brick bearing walls, and old hardwood over wood subfloors. These materials soak up water and give it back slowly. Cellars are cooler and damper than apartments, and cool air holds less moisture, so masonry in a cellar can take noticeably longer than a top-floor apartment.
How a contractor decides it's dry
- Readings are taken in dry areas of each material to set a baseline.
- Readings are taken in the wet areas on the first visit and every day after.
- Equipment moves to where the numbers are still high and comes out of rooms that have reached the baseline.
- The job ends when the readings say so, and the numbers go in the drying report.
What you can do
- Keep the equipment on, day and night.
- Keep windows closed unless the contractor has asked otherwise.
- Keep the heat at a normal setting in heat season.
- Don't move or unplug dehumidifiers; ask the contractor if one is in the way.
More detail on the process in structural drying.
Local note: Plaster, brick and old hardwood, the materials in most prewar walk-ups in 10458 and 10468, hold water longer than modern drywall and usually need more days of drying.
How You Know It's Dry
Daily readings show progress, and the job ends only when materials reach dry standard.